Share:

2000000-81.399 over PERM

Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:2000000-81.399 over PERM
Structure number:100540000001007
Location:NAUKATI
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:78.1 ft. [23.8 m]
Total length:160.8 ft. [49.0 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:28.9 ft. [8.8 m]
Owner:U.S. Forest Service [64]
Year built:1978
Year reconstructed:1990
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50 [as of 2006]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Sufficiency rating:94.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$360,000

2000 Inspection 

Average daily traffic:50 [as of 1993]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Sufficiency rating:91.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$360,000