3000000-37.88 over PERM
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 3000000-37.88 over PERM |
| Structure number: | 100540000001078 |
| Location: | RATZ |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 76.8 ft. [23.4 m] |
| Total length: | 79.7 ft. [24.3 m] |
| Roadway width between curbs: | 15.7 ft. [4.8 m] |
| Deck width edge-to-edge: | 17.7 ft. [5.4 m] |
| Owner: | U.S. Forest Service [64] |
| Year built: | 1991 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Main span material: | Wood or timber [7] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Wood or Timber [8] |
| Wearing surface: | Wood or Timber [7] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 50 [as of 2006] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Sufficiency rating: | 85.9 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $198,000 |
2000 Inspection
| Average daily traffic: | 40 [as of 1993] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Sufficiency rating: | 83.1 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $198,000 |