AVE F over VILLAGE CREEK

Map 

Coordinates:
+33.52119, -86.88903
33°31'16" N, 86°53'20" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:AVE F over VILLAGE CREEK
Structure number:000075
Location:AVENUE F ENS * VILLAGE CK
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:24.0 ft. [7.3 m]
Total length:109.6 ft. [33.4 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:35.4 ft. [10.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1913
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:5
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2014 

Status:Posted for load [P]
Average daily traffic:8,000 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:29.9 tons [27.2 metric tons]
Inventory rating:22.4 tons [20.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:47.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,542,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
September 201447.6Functionally obsoleteFairFairSatisfactory8000
October 201347.6Functionally obsoleteFairFairSatisfactory8000
October 201247.6Functionally obsoleteFairFairSatisfactory8000
March 201257.3Functionally obsoleteSatisfactorySatisfactorySatisfactory8000
October 201033.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
October 200833.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
April 200633.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
November 200433.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
July 200233.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
August 200033.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
October 199833.8Structurally deficientSatisfactorySatisfactorySatisfactory8000
October 199633.5Structurally deficientSatisfactorySatisfactorySatisfactory8000
December 199433.9Structurally deficientSatisfactorySatisfactorySatisfactory8000
December 199218.3Structurally deficientFairFairFair8000