Share:

12TH AVE NO over FRISCO & SO RR

Map 

Coordinates:
+33.53141, -86.80516
33°31'53" N, 86°48'19" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:12TH AVE NO over FRISCO & SO RR
Structure number:000076
Location:12TH AVE N & 26TH STREET
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Local (Urban) [19]
Length of largest span:29.9 ft. [9.1 m]
Total length:142.1 ft. [43.3 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:57.7 ft. [17.6 m]
Vertical clearance below bridge:21.0 ft. [6.4 m]
Skew angle:
Owner:City or Municipal Highway Agency [04]
Year built:1913
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,000 [as of 2004]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,150,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,500 [as of 1996]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.9 tons [17.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$319,000