Facts 

Name:21ST STREET over MORRIS AVE & RR
Structure number:000090
Location:21ST ST- 1ST S TO 1ST N
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:51.8 ft. [15.8 m]
Total length:962.0 ft. [293.2 m]
Roadway width between curbs:50.2 ft. [15.3 m]
Deck width edge-to-edge:72.8 ft. [22.2 m]
Vertical clearance below bridge:7.5 ft. [2.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1915
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:23
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:13,000 [as of 2004]
Truck traffic:1% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:3.0 tons [2.7 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$21,954,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:12,000 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:3.0 tons [2.7 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,921,000