Share:

22ND STREET over MORRIS AVE & RR

Map 

Coordinates:
+33.51444, -86.80203
33°30'52" N, 86°48'07" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:22ND STREET over MORRIS AVE & RR
Structure number:000091
Location:22ND ST- 1ST S TO 1ST N
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:56.4 ft. [17.2 m]
Total length:715.3 ft. [218.0 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:75.5 ft. [23.0 m]
Vertical clearance below bridge:20.0 ft. [6.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1915
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:18
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:14,000 [as of 2004]
Truck traffic:1% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:3.0 tons [2.7 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$16,919,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:13,900 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:3.0 tons [2.7 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,369,000