22ND STREET over MORRIS AVE & RR
Map
Coordinates:
+33.51444, -86.8020333°30'52" N, 86°48'07" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 22ND STREET over MORRIS AVE & RR |
| Structure number: | 000091 |
| Location: | 22ND ST- 1ST S TO 1ST N |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 56.4 ft. [17.2 m] |
| Total length: | 715.3 ft. [218.0 m] |
| Roadway width between curbs: | 56.1 ft. [17.1 m] |
| Deck width edge-to-edge: | 75.5 ft. [23.0 m] |
| Vertical clearance below bridge: | 20.0 ft. [6.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1915 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 18 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 14,000 [as of 2004] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Serious [3 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 3.0 tons [2.7 metric tons] |
| Inventory rating: | 3.0 tons [2.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 17.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $16,919,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 13,900 [as of 1996] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 3.0 tons [2.7 metric tons] |
| Inventory rating: | 3.0 tons [2.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 17.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $4,369,000 |