Share:

21 ST ST NO over VILLAGE CK

Map 

Coordinates:
+33.53920, -86.82114
33°32'21" N, 86°49'16" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:21 ST ST NO over VILLAGE CK
Structure number:000096
Location:21ST ST NO & VILLAGE CK
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:28.9 ft. [8.8 m]
Total length:56.8 ft. [17.3 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:50.5 ft. [15.4 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1915
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:700 [as of 2004]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:64.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,261,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:600 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.9 tons [17.2 metric tons]
Sufficiency rating:64.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$121,000