Share:

OLD U.S. 280 over CAHABA RIVER

Map 

Coordinates:
+33.43200, -86.71333
33°25'55" N, 86°42'48" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OLD U.S. 280 over CAHABA RIVER
Structure number:000311
Location:OLD 280 & CAHABA RIVER
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:65.9 ft. [20.1 m]
Total length:325.1 ft. [99.1 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.6 ft. [8.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1925
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,000 [as of 2009]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:44.0 tons [40.0 metric tons]
Inventory rating:26.4 tons [24.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,978,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:2,000 [as of 1996]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:16.0 tons [14.5 metric tons]
Inventory rating:12.0 tons [10.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:23.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$180,000