US 82 WBL over JENKINS CREEK

Map 

Coordinates:
+32.29173, -86.19065
32°17'30" N, 86°11'26" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 82 WBL over JENKINS CREEK
Structure number:000735
Location:1.9 MI W OF MERIWETHER RD
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:22.0 ft. [6.7 m]
Total length:242.1 ft. [73.8 m]
Roadway width between curbs:29.5 ft. [9.0 m]
Deck width edge-to-edge:31.8 ft. [9.7 m]
Owner:State Highway Agency [01]
Year built:1930
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:11
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,110 [as of 2008]
Truck traffic:20% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:46.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,745,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,990 [as of 1998]
Truck traffic:20% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.9 tons [17.2 metric tons]
Sufficiency rating:47.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,146,000