US 82 WBL over JENKINS CREEK
Map
Coordinates:
+32.29173, -86.1906532°17'30" N, 86°11'26" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US 82 WBL over JENKINS CREEK |
| Structure number: | 000735 |
| Location: | 1.9 MI W OF MERIWETHER RD |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 22.0 ft. [6.7 m] |
| Total length: | 242.1 ft. [73.8 m] |
| Roadway width between curbs: | 29.5 ft. [9.0 m] |
| Deck width edge-to-edge: | 31.8 ft. [9.7 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1930 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 11 |
| Main spans material: | Concrete [1] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,110 [as of 2008] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Sufficiency rating: | 46.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,745,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,990 [as of 1998] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 18.9 tons [17.2 metric tons] |
| Sufficiency rating: | 47.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,146,000 |