11TH CT N over RR (ABANDONED)
Map
Coordinates:
+33.51917, -86.7957633°31'09" N, 86°47'45" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 11TH CT N over RR (ABANDONED) |
| Structure number: | 002361 |
| Location: | 3RD ST & 11TH CT |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 50.9 ft. [15.5 m] |
| Total length: | 105.0 ft. [32.0 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 45.6 ft. [13.9 m] |
| Vertical clearance below bridge: | 22.3 ft. [6.8 m] |
| Skew angle: | 10° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1940 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 2004] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 38.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,905,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1996] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 18.9 tons [17.2 metric tons] |
| Sufficiency rating: | 51.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $237,000 |