CHURCH ST NW over PINHOOK CREEK

Map 

Coordinates:
+34.73828, -86.59355
34°44'18" N, 86°35'37" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CHURCH ST NW over PINHOOK CREEK
Structure number:003521
Old structure number:0000011745M0020 (from 1992 edition)
Location:CHURCH & PEGRAM NW
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:25.3 ft. [7.7 m]
Total length:81.0 ft. [24.7 m]
Roadway width between curbs:31.5 ft. [9.6 m]
Deck width edge-to-edge:44.6 ft. [13.6 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1930
Year reconstructed:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, would be posted or closed except for temporary shoring [D]
Average daily traffic:10,200 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:9.9 tons [9.0 metric tons]
Inventory rating:6.9 tons [6.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:28.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,529,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,130 [as of 1999]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:18.9 tons [17.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:39.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$240,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,900 [as of 1989]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$170,000