AL 269 over BAY VIEW LAKE
Map
Coordinates:
+33.53652, -86.9631133°32'11" N, 86°57'47" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | AL 269 over BAY VIEW LAKE |
| Structure number: | 004980 |
| Location: | 3 MI.S. CO RD 65 |
| Purpose: | Carries highway over waterway |
| Route classification: | Major Collector (Rural) [07] |
| Length of largest span: | 100.1 ft. [30.5 m] |
| Total length: | 380.9 ft. [116.1 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1954 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,450 [as of 2008] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 39.8 tons [36.2 metric tons] |
| Inventory rating: | 24.0 tons [21.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 53.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,257,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,600 [as of 1998] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 39.9 tons [36.3 metric tons] |
| Inventory rating: | 24.0 tons [21.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 52.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,191,000 |