Facts
| Name: | US 231 SBL over TALLAPOOSA RIVER |
| Structure number: | 005162 |
| Old structure number: | 00000009510407A (from 1992 edition) |
| Location: | MONTGOMERY ELMORE CO LINE |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 180.1 ft. [54.9 m] |
| Total length: | 1069.9 ft. [326.1 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 30.8 ft. [9.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1955 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 17,420 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 40.9 tons [37.2 metric tons] |
| Inventory rating: | 24.5 tons [22.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 65.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $10,331,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,125 [as of 1996] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 33.9 tons [30.8 metric tons] |
| Inventory rating: | 25.0 tons [22.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,345,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,115 [as of 1990] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 33.7 tons [30.6 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 65.3 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $4,044,000 |