I-85 over OSANIPPA CREEK
Map
Coordinates:
+32.79369, -85.2378932°47'37" N, 85°14'16" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-85 over OSANIPPA CREEK |
| Structure number: | 007258 |
| Location: | 3 MI N CUSSETA ROAD |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Interstate (Rural) [01] |
| Length of largest span: | 73.2 ft. [22.3 m] |
| Total length: | 429.2 ft. [130.8 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 30.8 ft. [9.4 m] |
| Skew angle: | 30° |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,725 [as of 2008] |
| Truck traffic: | 22% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 53.1 tons [48.3 metric tons] |
| Inventory rating: | 31.9 tons [29.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 59.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,399,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,330 [as of 1996] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 64.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $927,000 |