US80 over I85 NBL

Map 

Coordinates:
+32.36248, -86.21397
32°21'45" N, 86°12'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US80 over I85 NBL
Structure number:008258
Old structure number:00000008510188B (from 1992 edition)
Location:E.BYPASS AND I85 INTERCHE
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:73.2 ft. [22.3 m]
Total length:191.9 ft. [58.5 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.8 ft. [16.7 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,830 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:89.8
Estimated cost of work:$3,876,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,960 [as of 1996]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:88.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,905 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:91.1