UPPER WETUMPKA RD over C.OF GA.RR
Map
Coordinates:
+32.38252, -86.2935932°22'57" N, 86°17'37" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | UPPER WETUMPKA RD over C.OF GA.RR |
| Structure number: | 008716 |
| Old structure number: | 0000001651M002B (from 1992 edition) |
| Location: | 6.2 MI.E.OF W.CITY LIMITS |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 36.1 ft. [11.0 m] |
| Total length: | 155.8 ft. [47.5 m] |
| Roadway width between curbs: | 24.6 ft. [7.5 m] |
| Deck width edge-to-edge: | 36.1 ft. [11.0 m] |
| Skew angle: | 15° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1965 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 5 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,000 [as of 1991] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.0 tons [43.6 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $2,131,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,000 [as of 1991] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 18.9 tons [17.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 58.6 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $570,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,000 [as of 1990] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.8 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $327,000 |