Facts 

Name:SR 20 over INDIAN CREEK
Structure number:008735
Location:1.8 MI W JCT SR255 & SR20
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:34.1 ft. [10.4 m]
Total length:306.1 ft. [93.3 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:9
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,000 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:73.8 tons [67.1 metric tons]
Inventory rating:48.1 tons [43.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,498,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,590 [as of 1996]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:73.8 tons [67.1 metric tons]
Inventory rating:47.9 tons [43.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,029,000