Name:OPORTO-MADRID BLV over GEORGIA RD & RR
Structure number:009323
Location:OPORTO & GEORGIA RD
Purpose:Carries highway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:97.4 ft. [29.7 m]
Total length:581.1 ft. [177.1 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:67.6 ft. [20.6 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:24°
Owner:City or Municipal Highway Agency [04]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:9
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,400 [as of 2004]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.0 tons [40.9 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$12,807,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,400 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:67.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,872,000