Share:

GREEN COVE RD over ALDRIDGE CREEK

Map 

Coordinates:
+34.59511, -86.54568
34°35'42" N, 86°32'44" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:GREEN COVE RD over ALDRIDGE CREEK
Structure number:009610
Old structure number:0000000645M0190 (from 1992 edition)
Location:GRN COVE RD * ALDRIDGE CR
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:32.2 ft. [9.8 m]
Total length:128.0 ft. [39.0 m]
Roadway width between curbs:48.6 ft. [14.8 m]
Deck width edge-to-edge:50.2 ft. [15.3 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2014 

Status:Open, no restriction [A]
Average daily traffic:7,000 [as of 2013]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:26.0 tons [23.6 metric tons]
Sufficiency rating:88.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,496,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201488.3Not deficientGoodGoodGood7000
June 201276.2Not deficientGoodGoodGood6100
June 201076.2Not deficientGoodGoodGood6300
June 200876.2Not deficientGoodGoodGood6300
October 200676.2Not deficientGoodGoodGood6300
October 200476.2Not deficientGoodGoodGood6300
October 200276.2Not deficientGoodGoodGood6300
January 200176.2Not deficientGoodGoodGood6300
February 199977.7Not deficientGoodGoodGood2075
August 199677.5Not deficientGoodGoodGood2050
April 199577.5Not deficientGoodGoodGood2000
March 199577.5Not deficientGoodGoodGood2000
June 199375.6Not deficientSatisfactoryGoodSatisfactory1900
February 199181.8Not deficientSatisfactoryGoodSatisfactory1800