Share:

OLD MADISON PIKE over SR 255

Map 

Coordinates:
+34.69859, -86.67127
34°41'55" N, 86°40'17" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OLD MADISON PIKE over SR 255
Structure number:009808
Location:0.3 MI N JCT I-565&SR255
Purpose:Carries highway overpass over highway
Route classification:Local (Urban) [19]
Length of largest span:63.0 ft. [19.2 m]
Total length:230.0 ft. [70.1 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:57.1 ft. [17.4 m]
Vertical clearance below bridge:17.7 ft. [5.4 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,712 [as of 2004]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,714,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,941 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,326,000