Share:

I 65 over US 78 & 8 TH AVE NO

Map 

Coordinates:
+33.49686, -86.81567
33°29'49" N, 86°48'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 65 over US 78 & 8 TH AVE NO
Structure number:009907
Old structure number:00000I65370117A (from 1992 edition)
Location:I 65 & 8 TH AVE NO
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:83.0 ft. [25.3 m]
Total length:180.1 ft. [54.9 m]
Roadway width between curbs:62.3 ft. [19.0 m]
Deck width edge-to-edge:64.0 ft. [19.5 m]
Vertical clearance below bridge:18.4 ft. [5.6 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1969
Year reconstructed:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:67,530 [as of 2008]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:33.9 tons [30.8 metric tons]
Sufficiency rating:71.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$4,286,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:65,150 [as of 1996]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:33.9 tons [30.8 metric tons]
Sufficiency rating:83.6
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,403,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:56,015 [as of 1988]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:74.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$25,000