Facts 

Name:BAILEY COVE RD over ALDRIDGE CREEK
Structure number:010431
Old structure number:0000023745M0070 (from 1992 edition)
Location:8228 BAILEY COVE RD
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:8.9 ft. [2.7 m]
Total length:28.9 ft. [8.8 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: May 2014 

Status:Open, no restriction [A]
Average daily traffic:19,700 [as of 2011]
Truck traffic:2% of total traffic
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.3 tons [33.0 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:66.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,516,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201466.6Not deficient---19700
May 201266.6Not deficient---19700
May 201066.2Not deficient---22400
May 200859.9Not deficient---22400
September 200660.0Not deficient---21400
September 200457.3Not deficient---19900
September 200257.3Not deficient---19900
January 200157.8Not deficient---16360
January 199958.0Not deficient---16360
December 199657.8Not deficient---16350
December 199458.4Not deficient---16300
January 199358.4Not deficient---16200
January 199165.7Not deficient---16100