Share:

I 59/20 over 28 TH ST NO

Map 

Coordinates:
+33.53042, -86.80196
33°31'50" N, 86°48'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 59/20 over 28 TH ST NO
Structure number:010491
Old structure number:00000I59370255A (from 1992 edition)
Location:I 59 & 28 TH ST
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:70.9 ft. [21.6 m]
Total length:172.9 ft. [52.7 m]
Roadway width between curbs:77.8 ft. [23.7 m]
Deck width edge-to-edge:80.1 ft. [24.4 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:77,355 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.3 tons [54.8 metric tons]
Inventory rating:36.1 tons [32.8 metric tons]
Sufficiency rating:82.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$5,178,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:77,695 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:83.1
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,403,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:64,500 [as of 1988]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:83.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,000