Share:

RAMP 51 over HOLT ST.AND W.JEFF DAVIS

Map 

Coordinates:
+32.36611, -86.32046
32°21'58" N, 86°19'14" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RAMP 51 over HOLT ST.AND W.JEFF DAVIS
Structure number:010505
Location:I65 N TO I85 N
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:174.9 ft. [53.3 m]
Total length:498.1 ft. [151.8 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:42.3 ft. [12.9 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,777 [as of 2008]
Truck traffic:12% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:88.7
Estimated cost of work:$6,934,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,588 [as of 1997]
Truck traffic:14% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:89.8