I 59/20 over US 31 CTY STRS RR S
Map
Coordinates:
+33.52959, -86.8033633°31'47" N, 86°48'12" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 59/20 over US 31 CTY STRS RR S |
| Structure number: | 010671 |
| Location: | BHAM CIVIC CENTER |
| Purpose: | Carries highway over highway and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 104.0 ft. [31.7 m] |
| Total length: | 6632.2 ft. [2021.4 m] |
| Roadway width between curbs: | 69.9 ft. [21.3 m] |
| Deck width edge-to-edge: | 70.9 ft. [21.6 m] |
| Vertical clearance above deck: | 17.1 ft. [5.2 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 39 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 80,070 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 67.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $147,614,000 |
2000 Inspection
| Average daily traffic: | 1,000 [as of 1995] |
| Truck traffic: | 1% of total traffic |
| Evaluation: | Not applicable [N] |