I65 RAMP 52 over W.JEFF DAVIS AVE
Map
Coordinates:
+32.36608, -86.3225732°21'58" N, 86°19'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I65 RAMP 52 over W.JEFF DAVIS AVE |
| Structure number: | 010690 |
| Old structure number: | 00000I65510123C (from 1992 edition) |
| Location: | I65 AND I85 INTERCHANGE |
| Purpose: | Carries highway overpass over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 89.9 ft. [27.4 m] |
| Total length: | 299.9 ft. [91.4 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, would be posted or closed except for temporary shoring [D] |
| Average daily traffic: | 7,777 [as of 2008] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 60.8 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,108,000 |
2000 Inspection
| Status: | Open, would be posted or closed except for temporary shoring [D] |
| Average daily traffic: | 9,693 [as of 1997] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 60.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $908,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,210 [as of 1988] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.5 tons [43.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 90.8 |