BALDWIN BROOK DR over BALDWIN SLOUGH
Map
Coordinates:
+32.32065, -86.2534232°19'14" N, 86°15'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | BALDWIN BROOK DR over BALDWIN SLOUGH |
| Structure number: | 010774 |
| Old structure number: | 0000007051M0050 (from 1992 edition) |
| Location: | 200 FT E OF ENDCOTT DR |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 34.1 ft. [10.4 m] |
| Total length: | 103.0 ft. [31.4 m] |
| Roadway width between curbs: | 36.4 ft. [11.1 m] |
| Deck width edge-to-edge: | 45.9 ft. [14.0 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Channel beam [22] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,550 [as of 1992] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 64.0 tons [58.2 metric tons] |
| Inventory rating: | 38.4 tons [34.9 metric tons] |
| Sufficiency rating: | 96.9 |
| Estimated cost of work: | $1,881,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,550 [as of 1992] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 53.9 tons [49.0 metric tons] |
| Inventory rating: | 32.9 tons [29.9 metric tons] |
| Sufficiency rating: | 96.6 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,550 [as of 1990] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Sufficiency rating: | 82.4 |