AL152 WBL. over THREE MILE BRANCH
Map
Coordinates:
+32.42208, -86.2554432°25'19" N, 86°15'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | AL152 WBL. over THREE MILE BRANCH |
| Structure number: | 010801 |
| Old structure number: | 00000152510192B (from 1992 edition) |
| Location: | 1.4 MI. W. US 231 |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other (Rural) [02] |
| Length of largest span: | 34.1 ft. [10.4 m] |
| Total length: | 339.9 ft. [103.6 m] |
| Roadway width between curbs: | 39.4 ft. [12.0 m] |
| Deck width edge-to-edge: | 42.3 ft. [12.9 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 10 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,120 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 47.3 tons [43.0 metric tons] |
| Inventory rating: | 28.4 tons [25.8 metric tons] |
| Sufficiency rating: | 91.2 |
| Estimated cost of work: | $4,905,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,790 [as of 1996] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 65.9 tons [59.9 metric tons] |
| Inventory rating: | 39.9 tons [36.3 metric tons] |
| Sufficiency rating: | 98.8 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,770 [as of 1988] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 47.5 tons [43.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 99.2 |