Share:

I 59/20 over RAMP C

Map 

Coordinates:
+33.54872, -86.77829
33°32'55" N, 86°46'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 59/20 over RAMP C
Structure number:010868
Old structure number:00000I59370273D (from 1992 edition)
Location:I59 & 79
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:83.0 ft. [25.3 m]
Total length:180.1 ft. [54.9 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:69.9 ft. [21.3 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:38°
Owner:State Highway Agency [01]
Year built:1973
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:71,710 [as of 2008]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.1 tons [55.5 metric tons]
Inventory rating:36.9 tons [33.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,688,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:72,500 [as of 1996]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:90.1

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:53,000 [as of 1988]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.0