I65 SBL over DAY ST
Map
Coordinates:
+32.36962, -86.3226532°22'11" N, 86°19'22" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I65 SBL over DAY ST |
| Structure number: | 010876 |
| Old structure number: | 00000I65510125A (from 1992 edition) |
| Location: | 0.2 MI.N.OF I85 INTERCHNG |
| Purpose: | Carries highway overpass over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 74.2 ft. [22.6 m] |
| Total length: | 195.9 ft. [59.7 m] |
| Roadway width between curbs: | 64.6 ft. [19.7 m] |
| Deck width edge-to-edge: | 67.6 ft. [20.6 m] |
| Vertical clearance below bridge: | 16.7 ft. [5.1 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1973 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 39,745 [as of 2008] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.8 tons [68.0 metric tons] |
| Inventory rating: | 44.8 tons [40.7 metric tons] |
| Sufficiency rating: | 92.3 |
| Estimated cost of work: | $4,872,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 33,335 [as of 1997] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 93.9 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,210 [as of 1988] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.5 tons [43.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 94.9 |