RAMP D TO I59 over RAMP B TO I 20
Map
Coordinates:
+33.54754, -86.7467133°32'51" N, 86°44'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | RAMP D TO I59 over RAMP B TO I 20 |
| Structure number: | 011059 |
| Old structure number: | 00000I203700020 (from 1992 edition) |
| Location: | I20 & I59 INTR |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 75.1 ft. [22.9 m] |
| Total length: | 204.4 ft. [62.3 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 31.5 ft. [9.6 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1974 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,978 [as of 2008] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 83.3 tons [75.7 metric tons] |
| Inventory rating: | 49.8 tons [45.3 metric tons] |
| Sufficiency rating: | 96.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $2,355,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,700 [as of 1996] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 96.8 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,200 [as of 1988] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 96.8 |