CO RD over I65
Map
Coordinates:
+33.53312, -86.7983833°31'59" N, 86°47'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | CO RD over I65 |
| Structure number: | 011347 |
| Old structure number: | 00000I653701650 (from 1992 edition) |
| Location: | 1 . 4 MI NO 41 ST AVE |
| Purpose: | Carries highway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 87.9 ft. [26.8 m] |
| Total length: | 316.9 ft. [96.6 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 30.8 ft. [9.4 m] |
| Vertical clearance below bridge: | 17.7 ft. [5.4 m] |
| Skew angle: | 87° |
| Owner: | State Highway Agency [01] |
| Year built: | 1975 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 100 [as of 2000] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 83.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $3,379,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 100 [as of 1996] |
| Truck traffic: | 80% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 83.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $30,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,500 [as of 1988] |
| Truck traffic: | 80% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 73.4 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $20,000 |