AIRBASE BLVD over L&N RR
Map
Coordinates:
+32.35421, -86.3461032°21'15" N, 86°20'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | AIRBASE BLVD over L&N RR |
| Structure number: | 011514 |
| Old structure number: | 0000027151M001B (from 1992 edition) |
| Location: | 0.1 MI.N.OF MOBILE ROAD |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 60.0 ft. [18.3 m] |
| Total length: | 164.1 ft. [50.0 m] |
| Roadway width between curbs: | 48.6 ft. [14.8 m] |
| Deck width edge-to-edge: | 50.2 ft. [15.3 m] |
| Vertical clearance below bridge: | 23.3 ft. [7.1 m] |
| Skew angle: | 6° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1975 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,470 [as of 1988] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 96.2 |
| Estimated cost of work: | $3,101,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,470 [as of 1988] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 99.2 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,470 [as of 1988] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 99.4 |