Share:

JOHN ROGERS DRIVE over SEABOARD RAILROAD

Map 

Coordinates:
+33.58702, -86.65654
33°35'13" N, 86°39'24" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:JOHN ROGERS DRIVE over SEABOARD RAILROAD
Structure number:012830
Location:JOHN ROGERS DR & US78
Purpose:Carries highway over railroad
Route classification:Local (Urban) [19]
Length of largest span:54.1 ft. [16.5 m]
Total length:165.4 ft. [50.4 m]
Roadway width between curbs:76.1 ft. [23.2 m]
Deck width edge-to-edge:78.7 ft. [24.0 m]
Vertical clearance below bridge:23.0 ft. [7.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 2004]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:46.0 tons [41.8 metric tons]
Inventory rating:20.4 tons [18.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,902,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,000 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$333,000