PELZER AVE over THREE MI BRANCH
Map
Coordinates:
+32.36667, -86.2666732°22'00" N, 86°16'00" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PELZER AVE over THREE MI BRANCH |
| Structure number: | 013272 |
| Old structure number: | 0000001251M0100 (from 1992 edition) |
| Location: | 3.4 MI E OF W CITY LMTS |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 34.1 ft. [10.4 m] |
| Total length: | 67.9 ft. [20.7 m] |
| Roadway width between curbs: | 31.8 ft. [9.7 m] |
| Deck width edge-to-edge: | 49.9 ft. [15.2 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1984 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Channel beam [22] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,500 [as of 1992] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 72.4 tons [65.8 metric tons] |
| Inventory rating: | 43.5 tons [39.5 metric tons] |
| Sufficiency rating: | 94.8 |
| Estimated cost of work: | $1,449,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,500 [as of 1992] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 95.8 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,500 [as of 1990] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 29.7 tons [27.0 metric tons] |
| Sufficiency rating: | 95.4 |