Share:

US 31 over 5TH 7TH & 8TH AVE NO(11)

Map 

Coordinates:
+33.51213, -86.79311
33°30'44" N, 86°47'35" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 31 over 5TH 7TH & 8TH AVE NO(11)
Structure number:013837
Location:US 31 & 1ST & 2ND AVE NO
Purpose:Carries highway overpass over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:180.1 ft. [54.9 m]
Total length:3257.0 ft. [992.7 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:46.9 ft. [14.3 m]
Vertical clearance below bridge:20.0 ft. [6.1 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1972
Year reconstructed:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:22
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,490 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:79.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$47,988,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,540 [as of 1997]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$150,000