Share:

US 31 SBL over CATOMA CREEK

Map 

Coordinates:
+32.32057, -86.34886
32°19'14" N, 86°20'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 31 SBL over CATOMA CREEK
Structure number:013887
Old structure number:00000003510169A (from 1992 edition)
Location:0.6 MI.S.OF SOU BLVD
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:69.9 ft. [21.3 m]
Total length:808.1 ft. [246.3 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.7 ft. [13.0 m]
Owner:State Highway Agency [01]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,205 [as of 2008]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:55.0 tons [50.0 metric tons]
Inventory rating:28.8 tons [26.2 metric tons]
Sufficiency rating:93.3
Estimated cost of work:$10,816,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,935 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:97.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,245 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.6