Share:

I-565 N. FRONTAGE over LIMESTONE CREEK

Map 

Coordinates:
+34.61667, -86.86667
34°37'00" N, 86°52'00" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-565 N. FRONTAGE over LIMESTONE CREEK
Structure number:014141
Location:2.5 MI. E JCT I65 & 565
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:79.1 ft. [24.1 m]
Total length:571.9 ft. [174.3 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:30.8 ft. [9.4 m]
Owner:State Highway Agency [01]
Year built:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:550 [as of 2003]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:91.9
Estimated cost of work:$5,745,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:480 [as of 1997]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:94.0