Share:

OXMOOR ROAD over PALISADES DRIVE

Map 

Coordinates:
+33.45000, -86.78333
33°27'00" N, 86°46'60" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OXMOOR ROAD over PALISADES DRIVE
Structure number:014274
Location:PALISADES DR & OXMOOR RD
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:30.8 ft. [9.4 m]
Total length:405.2 ft. [123.5 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Vertical clearance below bridge:19.4 ft. [5.9 m]
Skew angle:99°
Owner:City or Municipal Highway Agency [04]
Year built:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Tunnel [18]
Deck type:Other [9]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 2004]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,058,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$870,000