Share:

I85 over MCDONOUGH ST

Map 

Coordinates:
+32.36779, -86.30459
32°22'04" N, 86°18'17" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I85 over MCDONOUGH ST
Structure number:014461
Location:1.06 MI N OF I65
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:64.0 ft. [19.5 m]
Total length:169.0 ft. [51.5 m]
Roadway width between curbs:105.0 ft. [32.0 m]
Deck width edge-to-edge:110.9 ft. [33.8 m]
Vertical clearance below bridge:19.4 ft. [5.9 m]
Owner:State Highway Agency [01]
Year built:1966
Year reconstructed:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:84,530 [as of 2008]
Truck traffic:13% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:83.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$7,041,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:70,170 [as of 1997]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,899,000