CARL T. JONES DR. over ALDRIDGE CREEK
Map
Coordinates:
+34.67834, -86.5490034°40'42" N, 86°32'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | CARL T. JONES DR. over ALDRIDGE CREEK |
| Structure number: | 014603 |
| Old structure number: | 0000005945M022B (from 1992 edition) |
| Location: | 2.2 MILES EAST HWY 231 S |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 36.1 ft. [11.0 m] |
| Total length: | 107.9 ft. [32.9 m] |
| Roadway width between curbs: | 26.9 ft. [8.2 m] |
| Deck width edge-to-edge: | 37.7 ft. [11.5 m] |
| Skew angle: | 33° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1988 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,300 [as of 2007] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,611,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,300 [as of 1997] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $296,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,000 [as of 1990] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 75.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $197,000 |