Share:

I-565 over CHAPMAN ROAD

Map 

Coordinates:
+34.75000, -86.56667
34°45'00" N, 86°34'00" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-565 over CHAPMAN ROAD
Structure number:015823
Location:3 MI E JCT I565 & SR53
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:73.2 ft. [22.3 m]
Total length:73.2 ft. [22.3 m]
Roadway width between curbs:81.4 ft. [24.8 m]
Deck width edge-to-edge:86.9 ft. [26.5 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:40,650 [as of 2008]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:94.2
Estimated cost of work:$2,716,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,920 [as of 1997]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:93.5