Share:

SH 197 over LITTLE SHOAL CR.

Map 

Coordinates:
+35.28884, -93.42069
35°17'20" N, 93°25'14" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SH 197 over LITTLE SHOAL CR.
Structure number:000000000001140
Location:OLD HWY 22 @ NEW BLAINE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:42.0 ft. [12.8 m]
Total length:245.1 ft. [74.7 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:23.0 ft. [7.0 m]
Owner:State Highway Agency [01]
Year built:1929
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:M 13.5 / H 15 [2]
Number of main spans:7
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:240 [as of 2008]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:30.9 tons [28.1 metric tons]
Inventory rating:18.9 tons [17.2 metric tons]
Sufficiency rating:59.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:300 [as of 1994]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:30.7 tons [27.9 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:59.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:80 [as of 1987]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:30.7 tons [27.9 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:70.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$798,000