Share:

CR 39 over Creek

Map 

Coordinates:
+34.48000, -91.36333
34°28'48" N, 91°21'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CR 39 over Creek
Structure number:000000000010034
Location:0.2 Mi N SH 153
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:13.1 ft. [4.0 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:16.1 ft. [4.9 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Owner:County Highway Agency [02]
Year built:1976
Year reconstructed:2000
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:2
Main spans material:Wood or timber [7]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:107 [as of 1987]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:13.0 tons [11.8 metric tons]
Inventory rating:9.0 tons [8.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:45.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:107 [as of 1994]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:12.9 tons [11.7 metric tons]
Inventory rating:8.9 tons [8.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:45.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$209,000

1992 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:107 [as of 1987]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:18.8 tons [17.1 metric tons]
Inventory rating:8.7 tons [7.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$87,000