SH 51 over STONE QUARRY CREEK

Map 

Coordinates:
+34.44822, -92.83369
34°26'54" N, 92°50'01" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SH 51 over STONE QUARRY CREEK
Structure number:0000000000A0365
Location:AT MAGNET COVE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:24.9 ft. [7.6 m]
Total length:49.9 ft. [15.2 m]
Roadway width between curbs:28.9 ft. [8.8 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Owner:State Highway Agency [01]
Year built:1928
Year reconstructed:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,100 [as of 2008]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:41.9 tons [38.1 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Sufficiency rating:70.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 1994]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:41.6 tons [37.8 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:68.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$72,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,996 [as of 1987]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:41.6 tons [37.8 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:70.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$237,000