Share:

SH 377 over GOURD CREEK

Map 

Coordinates:
+35.88405, -92.83065
35°53'03" N, 92°49'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SH 377 over GOURD CREEK
Structure number:0000000000M3003
Location:2.1MI SO. JCT SH 74
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:23.0 ft. [7.0 m]
Total length:50.9 ft. [15.5 m]
Roadway width between curbs:20.7 ft. [6.3 m]
Deck width edge-to-edge:23.6 ft. [7.2 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1940
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:190 [as of 2008]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:27.0 tons [24.5 metric tons]
Inventory rating:16.0 tons [14.5 metric tons]
Sufficiency rating:47.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:260 [as of 1994]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:11.9 tons [10.8 metric tons]
Inventory rating:4.0 tons [3.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:16.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$52,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:143 [as of 1987]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:21.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$164,000