WEST CAPITOL AVE over SACRAMENTO RIVER

Map 

Coordinates:
+38.58028, -121.50806
38°34'49" N, 121°30'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WEST CAPITOL AVE over SACRAMENTO RIVER
Structure number:22 0021
Location:03-YOL-275-13.07-WSAC
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:209.0 ft. [63.7 m]
Total length:737.9 ft. [224.9 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:68.6 ft. [20.9 m]
Vertical clearance above deck:14.1 ft. [4.3 m]
Vertical clearance below bridge:100.1 ft. [30.5 m]
Owner:State Highway Agency [01]
Year built:1934
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:MS 13.5 / HS 15 [3]
Main span material:Steel [3]
Main span design:Movable - Lift [15]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,000 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:61.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$7,912,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,300 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:61.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$8,461,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,640,000