Share:

STATE ROUTE 160 SB over N160-DEL PASO OFF, LRT

Map 

Coordinates:
+38.60028, -121.46833
38°36'01" N, 121°28'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:STATE ROUTE 160 SB over N160-DEL PASO OFF, LRT
Structure number:24 0111L
Location:03-SAC-160-R45.02-SAC
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:71.9 ft. [21.9 m]
Total length:299.9 ft. [91.4 m]
Roadway width between curbs:28.5 ft. [8.7 m]
Deck width edge-to-edge:31.8 ft. [9.7 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:61°
Owner:State Highway Agency [01]
Year built:1946
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,750 [as of 1998]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.8 tons [61.6 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,475,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,345 [as of 1997]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.8 tons [61.6 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,579,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,800 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$637,000