INTERSTATE 80 WB over UP RR, BNSF RY,STEELHEAD
Map
Coordinates:
+38.64167, -121.4683338°38'30" N, 121°28'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | INTERSTATE 80 WB over UP RR, BNSF RY,STEELHEAD |
| Structure number: | 24 0218L |
| Location: | 03-SAC-080-M5.21-SAC |
| Purpose: | Carries highway over railroad and waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 103.0 ft. [31.4 m] |
| Total length: | 785.1 ft. [239.3 m] |
| Roadway width between curbs: | 50.9 ft. [15.5 m] |
| Deck width edge-to-edge: | 53.2 ft. [16.2 m] |
| Vertical clearance below bridge: | 24.0 ft. [7.3 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 8 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 64,000 [as of 2000] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 75.9 tons [69.0 metric tons] |
| Inventory rating: | 45.7 tons [41.5 metric tons] |
| Sufficiency rating: | 80.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 50,450 [as of 1997] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 74.8 tons [68.0 metric tons] |
| Inventory rating: | 44.9 tons [40.8 metric tons] |
| Sufficiency rating: | 84.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 42,200 [as of 1990] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 72.0 |