Share:

INTERSTATE 5 over S5-E50 CONN RP, BROADWAY

Map 

Coordinates:
+38.56694, -121.51194
38°34'01" N, 121°30'43" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:INTERSTATE 5 over S5-E50 CONN RP, BROADWAY
Structure number:24 0267
Location:03-SAC-005-22.42-SAC
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:121.1 ft. [36.9 m]
Total length:348.1 ft. [106.1 m]
Roadway width between curbs:139.1 ft. [42.4 m]
Deck width edge-to-edge:142.1 ft. [43.3 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:126,000 [as of 2000]
Truck traffic:12% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:14.0 tons [12.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$20,058,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:112,100 [as of 1997]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.8 tons [45.3 metric tons]
Inventory rating:14.0 tons [12.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$5,513,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:105,200 [as of 1990]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:44.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$11,415,000